Featured

Motive Creative Studio

  • 15,649 SF of existing historic building in Rhino District repurposed into multiple commercial suites. 

  • International Advertising Firm with unique vision forspace utilization. 

  • Concrete resurfacing, staining, and polishing along with exposed ceiling structure with acoustical treatments and unique glazing and sliding barn door office fronts. 

  • Custom features throughout including cargo container walls, reclaimed wood, antique fire doors, and an executive area including bar and gaming features. 

Ready Talk

  • 43,296 SF LEED Certified tenant finish with two floors and a 3,000 SF exterior patio 

  • High end millwork and finishes 

Sam Gary, Jr and Associates

  • 21,000 SF high end custom office space 

  • The scope of work included custom multiple hard lid ceilings to produce an image of Tectonic Plates at multiple elevations, hardwood flooring at reception and executive areas, stone accent walls and wood sliding barn doors at all offices. 

  • Custom built conference room and mapping tables, exterior terrace with Bocce Ball court and trellis. 

Shared Services

  • Tenant improvement of a 10,032 SF space which included an ASID Award winning design element.

  • The scope included custom wood office fronts with zebrawood doors and an unique break room with quartz tops and built in benches.  

  • Large conference room focal points are ceiling medallions and blue tinted glass doors with prominent lighting throughout the space.

Tendril

  • Tenant Improvement scope of work for a multiple buildings and floors totaling 57,000 SF. 

  • Open environment build out with custom millwork and flooring and extensive coordination of Owner's equipment.

  • A fast track 70 days construction schedule which was completed on schedule.

The Yard at 2323 Delgany

  • Renovation of an existing 90,000 SF warehouse into an office building for future tenant leasing located across from Coors Field. 

  • Design incorporated large 10’x18’ windows around perimeter, new porch and large glass storefront surround the new entry vestibule. 

  • New restrooms, locker rooms, 15,000 SF mezzanine addition for fitness center, conference room and future tenant space. 

  • Industrial concept utilizes high ceilings, precast concrete structure, exposed ductwork and polished concrete floors in core area. 

TransAmerica

  • 127,375 SF Signature Name Tenant at 1801 California.

  • Five Floor Tenant Finish with Modern and CUstom Decor throughout the Space, High End Executive Suite and Boardroom, and Upgrade Stone Wall with high Occupancy Client Meeting Area.

Wheeler Trigg O’Donnell

  • 61,500 SF three floor fast track project 

  • Custom designed three mock courtrooms, executive offices, and conference rooms 

  • Custom architectural stairwell with marble walls, architectural metal rails, floating wood stairs, Maple and Eucalyptus millwork and walls, Nana Wall systems, and marble floors 

Halcon Resources - Denver, Colorado

  • 40,000 SF fast track tenant improvement 

  • Internal stair update with custom railing, two large break room build outs 

  • Magnetic walls and wall covering in all offices, high end elevator lobby and millwork 

Ibotta

  • A tenant build out at 1801 California for a long term client with multiple projects. 

  • Full floor build out of 58,360 SF with the completed project on time and on budget.

  • Finishes included polished concrete, high end millwork, and open track sliding glass office doors. 

  • Large computer and electronic office table tops were also included in the scope of work. 

Intrepid Potash

  • 40,395 SF tenant improvement for the Penthouse floors of the building 

  • High end custom millwork, glazing and flooring on both floors as well as extensive marble floor tile and counter tops 

Jagged Peak

  • Multiple buildouts with long term client 

  • Fast track construction 

  • 62,000 SF in 16 weeks with hard move in date for both build outs 

  • High end finishes an millwork including restrooms 

  • New internal staircase, executive floor, media rooms, exercise and shower rooms 

Liberty Global

  • Provident utilized BIM for the coordination and placement for all mechanical, electrical, plumbing, sprinkler, audio visual and cabling in walls and ceilings. Also, there is a three floor floating connecting stair with full glass handrails, granite stair treads and LED lighting incorporated into floor. 

  • State of the art training room with seating up to 78 people that includes 3 projectors and screens to be individually controlled with hidden in wall speakers. Also included in the scope of work, a full service commercial kitchen that has the capacity to serve over 150 employees daily with café and outside balcony seating.

Littleton Village

  • One acre site with a 7,000 SF retail builidng currently under construction. 

  • Installation of Creative Mines board form materials with real barn wood accents 

LogRhythm

  • 38,400 SF tenant renovation with a cutting edge design within three floors 

  • The scope of work included interior finishes, Polygal panels, Beetle Kill wood flooring and paneling painted metal studs, sliding glass office doors, exposed structure ceiling areas, Geo Matrix, and corrugated fiberglass ceiling panels. 

  • Exterior ground level, roof top decks, data center, and loading dock were also included in the scope of work. 

Medtronic Navigation Surgical Technologies

  • 108,000 SF state of the art medical technology facility 

  • Ground up and tenant improvements at locations in Louisville, Colorado and Parker, Colorado 

  • Multiple tenant improvement including sales center, training and operating rooms, offices, lobby, labs, and break rooms

Denver Design District East Building Renovation at 595 Broadway

  • Renovation of an existing 65,500 SF office building. 

  • Preconstruction Services also included value engineered the exterior wall material and system to save the client 10% of the total price of the project.  Preconstruction Services included providing cost summaries for multiple iterations of design styles and materials. 

  • All new exterior curtain wall system to replace existing gauge exterior framing system. 

  • New roof and saw cut roof to provide new skylights also in the scope, all new electical service and HVAC equipment. 

  • Common area amenities, including fitness center, and core restrooms.

Evolve Vacation Rental Network

  • Tenant improvement project of two floors at a total of 38,500 SF.

  • The construction scope inclued conference, huddle rooms and offices with separate open office area in quadrants.

  • Open to structure concept with new metal ductwork, and new floor to floor custom staircase. 

  • Large employee break / lunch room and multiple booth style collaboration areas with television monitors 

Four Winds

  • Three floors totaling 55,000 SF of first generation space at the Art Hotel at 1221 Broadway.  Fourteen week schedule completed on time and on budget.

  • High-end finishes including gym, yoga rooms, shower facilities, three elevator lobbies, media rooms and the first in the U.S. LED carpet for personnel and room location identity.

  • The scope also included three IDF server rooms with heavy A/V media cabling, infrastructure and equipment.