Corporate Interiors

Newmont Mining Corporate Headquarters

  • 218,505 SF tenant finish for a long term client 

  • New data center with 24/7 cooling, UPS power, building generator back-up, with custom break rooms, Cherry and Anigre wood paneling and wood paneled ceilings accent on each floor. 

Northwestern Mutual

  • Negotiated 31,803 SF Tenant Improvement with High End Interior Finishes Included Four Reception Areas, Metal Wall Panels, Glass Sliding Doors, Large Multi-Purpose Media Rooma and High End Millwork.

  • New Multi-Floor Restroom Package and New Interior Stairway.

Policy Studies

  • 75,080 SF two floor tenant build out with a connecting stairway 

  • The scope of work included extensive structural modifications, large data and communication room with 24/7 air, several multiple function rooms with folding partitions and audio visual upgrades 

Shared Services

  • Tenant improvement of a 10,032 SF space which included an ASID Award winning design element.

  • The scope included custom wood office fronts with zebrawood doors and an unique break room with quartz tops and built in benches.  

  • Large conference room focal points are ceiling medallions and blue tinted glass doors with prominent lighting throughout the space.

Sketch Up

  • 13,389 SF fast track schedule tenant improvement 

  • The scope of work included cutting edge design and extensive IT infrastructure with fully redundant data center

TransAmerica

  • 127,375 SF Signature Name Tenant at 1801 California.

  • Five Floor Tenant Finish with Modern and CUstom Decor throughout the Space, High End Executive Suite and Boardroom, and Upgrade Stone Wall with high Occupancy Client Meeting Area.

Kiewit Corporation

  • Consolidated Several Kiewit Construction Groups into One Building on Three Floors in Englewood, Colorado.

  • Self-Performed Carpentry, Doors, and Hardware on Project to Ensure Schedule was met.

  • Facilitated Coordination between Building Department and Architect on Glass Atrium to make sure Design Intent was Achieved.

Liberty Global

  • Provident utilized BIM for the coordination and placement for all mechanical, electrical, plumbing, sprinkler, audio visual and cabling in walls and ceilings. Also, there is a three floor floating connecting stair with full glass handrails, granite stair treads and LED lighting incorporated into floor. 

  • State of the art training room with seating up to 78 people that includes 3 projectors and screens to be individually controlled with hidden in wall speakers. Also included in the scope of work, a full service commercial kitchen that has the capacity to serve over 150 employees daily with café and outside balcony seating.

Gensler Architects

  • 19,963 SF Tenant Improvement which achieved the First LEED-Certified Interiors Project Designation in Colorado under the LEED v4 CI rating system by the USGBC.

  • The Gensler Office Project won the IIDA Best Award for Workplace 15,000 - 50,000 SF.

  • Two Mezzanines with Two Stair Openings, Revolving Door and Extensive Glass Work, Early Coordination on Design with Team, and Raw Material Used - Steel, Concrete, and Wood.

  • Office Features also included Sustainable LED Lighting with Motion Sensors, Low Emitting Materials, Energy and Water Saving Equipment and Interior Plantscaping.

CIBER

  • 67,240 SF multi floor tenant finish project with a 20 week fast track schedule for a long term client 

  • Scope of work included a SCIF room, stairwell, high end executive suites, boardrooms, training facilities, and custom wall textures 

Arrow Electronics

  • Provident Construction has completed 6 projects for Arrow Electronics including new the Corporate Headquarters.

  • Corporate Headquarters was a full building remodel of 4 floors with phased construction and occupancy. Areas completed included a full service kitchen, exercise / yoga, meeting, training rooms, and a conference center.